THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPMENT OF NIGERIA ( A CASE STUDY OF SOME SELECTED PROJECT SUPERVISORS IN JULIUS BEGER PLC AND MARLUM CONSTRUCTION COMPANY)


THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPMENT OF NIGERIA ( A CASE STUDY OF SOME SELECTED PROJECT SUPERVISORS IN JULIUS BEGER PLC AND MARLUM CONSTRUCTION COMPANY)    

TABLE OF CONTENT

Title Page………………..i

Certification………….…ii

Dedication………………iii

Acknowledgement……….iv

Table of content……...…v

CHAPTER ONE: INTRODUCTION

1.1 background of the study

1.2 problem statement

1.3 objectives of the study

1.4 research questions

1.5 research hypothesis

1.6 significance of the study

1.7 scope of the study

1.8 limitations of the study

1.9    Definition of terms

References

CHAPTER TWO: LITERATURE REVIEW

2.1 introduction

2.2 cost and time growth of project construction

2.3 forecasting construction project time in Construction industry

2.4 significance of time forecasting in the construction Industry

2.5 activity time-cost relationship

2.6 project time-cost relationship

2.7 shortening project duration

2.8 cpm cost loading

2.9 proof of delay methodology

2.10 causes of delay and cost overruns in construction Of projects in nigeria

2.11 time impact analysis

2.12 earned-value based methods in project Construction

2.13 project risk identification

2.14 delay classification

2.15 rework costs

2.16 time impact analysis specification

2.17 comparison of calculated results with actual Observance

2.18 forecasting performance in project construction

2.19 project construction

2.20 change order evaluation in project construction

2.21 preparation for estimation in project construction

2.22 preparing the estimate

2.23 impact cost considerations

References

CHAPTER THREE: RESEARCH METHODOLOGY

3.1 introduction

3.2 research design

3.3 population and sample size

3.4 sampling procedure

3.5 data collection procedure

3.6 data organisation and analysis

3.7 techniques of data analysis

CHAPTER FOUR: DATA ANALYSIS AND INTERPRETATION

Analysis of questionnaire response by sex

CHAPTER FIVE: SUMMARY OF FINDINGS, CONCLUSION AND RECOMMENDATION

5.1 Findings

5.2 Conclusion

5.3 Recommendations

Bibliography

Appendix

Questionnaire

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.

Time factors are inherent in all of project construction’s undertakings. Construction projects have long been recognized as particularly cost, time and risk-laden. Some of the time and cost factors associated with the construction process are fairly predictable or identifiable; others may be totally unforeseen. The constructed project may not perform as anticipated because the owner may have unrealistic expectations regarding the delivery time of construction forcing contractors into unrealistic gambles, corner-cutting or commitments that may not be realistic (Frimpong 2003).

Project success can be defined as meeting goals and objectives as prescribed in the project plan. A successful project means that the project has accomplished its technical performance, maintained its schedule, and remained within budgetary costs. Project management tools and techniques play an important role in the effective management of a project. Therefore, a good project management lies in the management tools and techniques used to manage the project. Project management involves managing the resources—workers, machines, money, materials and methods used. Some projects are effectively and efficiently managed while others are mismanaged, incurring much delay and cost overruns and negatively affecting the economy (Frimpong 2003).

Assessing construction projects’ delivery time is critical in today’s market-driven economy.

To improve the economy and maximize long-term return on this public investment, government agencies have recently started utilizing new types of contracting methods that are designed to achieve multiple project objectives, including minimizing construction cost and duration, while maximizing its quality.

In recent years, many departments of transportation, in various states have started to apply new highway contracting methods, including: Bidding on time i.e., to encourage competition among contractors to minimize project duration (Holt et al2000), Incentive/ disincentive contract clauses that provide financial incentives to reduce construction duration, Nighttime construction that seeks to cut service disruption and project time by requiring contractors to work during off-peak nighttime hours, Warranty contracting that attempts to improve construction quality by making contractors liable for the performance of the facility after project completion. These new and emerging contracts place an increasing pressure on decision makers in the construction industry to search for an optimal/near-optimal resource utilization plan that minimizes construction time while maximizing its quality. This creates new and pressing needs for advanced resource utilization models that are capable of optimizing the multiple and conflicting objectives of construction time, cost, and quality.

Significant research advancements have been made in the area of optimizing construction resource utilization. This led to a number of optimization models. These models can be classified according to their optimization objectives into models that attempted to:

• Minimize project time and/or improve resource utilization;

• minimize time and cost for non-repetitive construction using time-cost trade-off analysis

• minimize time and/or cost for repetitive construction

While the above research study seeks to provide significant contributions to the area of optimizing construction resource utilization, there has been little or no reported research focusing on multi objective models for optimizing construction time, cost, and quality.

1.2 PROBLEM STATEMENT

Misallocation and misperception of time factor in construction projects have resulted in the government of Nigeria paying more than necessary for many projects. Improper time assessment can also cause additional costs in the form of delays which result in poor utilization, increasing social and economic costs. Are contractors using the most appropriate resources to execute projects in Nigeria? Do they mobilize the needed resources within the approved time frame allotted to their contracts? What effects do short time periods and/ or extended time periods have on their project costs? Are there remedies to these situations?

These are some of the situations that have prompted the researcher to go deep into the assessment of the cost and time impacts of public sector construction projects in Nigeria.

1.3 OBJECTIVES OF THE STUDY

The study had the main objective of assessing the effects of timely delivery of construction projects on the economy of Nigeria, but specifically it had the following objectives.

1.    To establish the extent to which time factors have impacted on construction of projects in the public sector in Nigeria.

2.    To find out the change in the perception of contractors on time effects on public sector construction in Nigeria.

3.    To find out the relationship between timely delivery of construction projects and the economic development of Nigeria.

1.4 RESEARCH QUESTIONS

In order to achieve the objectives of the study, the following research questions were used by the researcher:

1.    What effects do time factors have on construction of projects in Nigeria?

2.    Has the perception of contractors on time factors in projects construction changed in recent years?

3.    What relationship exists between timely delivery of construction projects and economic development in Nigeria?

1.5 RESEARCH HYPOTHESIS

Ho: There is no significant relationship between timely delivery of construction projects and economic development of Nigeria.

Hi: There is a significant relationship between timely delivery of construction projects and economic development of Nigeria.

1.6 SIGNIFICANCE OF THE STUDY

All construction contracts allocate time between owners and contractors. Hence the significance of this study would better inform improved project relationships and communications and enhance construction administration practices between owners and contractors.

The findings would also enhance and broaden time of wide range of risks that could materialize during the design, and construction phases of a project which would subsequently result in better and more prudent designs specifications.

1.7 SCOPE OF THE STUDY

The researcher will limit the study to the effects of timely delivery of construction projects on the economy of Nigeria, using responses from some selected project supervisors from Julius Berger Nigeria Plc and Marlum Nigeria Plc in Uyo, AkwaIbom State as a case study. Findings and recommendations by the researcher may not be used for general analysis as the researcher could not assess numerous construction projects due to time and financial constraints.

1.8 LIMITATIONS OF THE STUDY

Construction of projects in the public sector has assumed significant functions, hence the need for assessment on the cost and time impacts of construction of projects in order to achieve overall project objectives. Historical project schedule and duration data is treated as confidential by Julius Berger Nigeria Plc hence getting data for this study was very difficult. Data collection and analysis was therefore limited to the data received from project supervisors in the field of project construction.

1.10    DEFINITION OF TERMS

1.    Economy:An economy consists of the 1.    economic system in a certain region, comprising the 1.    production, 1.    distribution or 1.    trade, and 1.    consumption of 1.    goods and 1.    services in that region or country. An economy is the total aggregate sum of all transactions of value between two agents, such as one individual to one other individual, or between groups of individual activity, such as in organizations to other organizations, and between one nation and another nation.

2.    Construction: In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

3.    Deliverable: Deliverable is a term used in project management to describe a tangible or intangible object produced as a result of the project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a server upgrade or any other building block of an overall project.

4.    Project management:this is the discipline of planning, organizing, motivating, and controlling resources to achieve specific goals. A project is a temporary endeavour with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables),undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.

5.    Time: This is a dimension in which events can be ordered from the past through the present into the future,and also the measure of durations of events and the intervals between them.

REFERENCES

1.    Frimpong, Y. (2003). Project management in developing countries: causes of delay and cost overruns in construction of groundwater projects. Unpublished Masters Research Project, University of Technology, Sydney, Australia.

2.    Holt, G. D., Proverbs, D., and Love, P. E. D. 2000. ‘‘Survey findings on UK construction procurement: Is it achieving lowest cost, or value?’’ Asia Pac. Building Construct. Manage. J., 5, 13–20.

.

THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPMENT OF NIGERIA ( A CASE STUDY OF SOME SELECTED PROJECT SUPERVISORS IN JULIUS BEGER PLC AND MARLUM CONSTRUCTION COMPANY)



TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.NET

Researchwap.net is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.net guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.