This project work titled design and implementatiom of a computerized production scheduler assignment problem approach. Deals with how machine can be assigned to production of goods in order to minimize cost and time. It gives an introduction of scheduling, the historical background of the case study and the scope of the study.  

TABLE OF CONTENT

Page

Certification i

Dedication ii

Abstract iii

Acknowledgement iv

Table of content v

CHAPTER ONE

INTRODUCTION

HISTORICAL BACKGROUND OF THE CASE STUDY

ORGANIZATIONAL STRUCTURE OF THE CASE STUDY

SCOPE OF THE PROJECT          

AIMS AND OBJECTIVES OF THE PROJECT

STATEMENT OF THE PROJECT

CHAPTER TWO

2.0 LITERATURE REVIEW

2.1 OVERVIEW OF ASSIGNMENT PROBLEM TECHNIQUES

2.2 PRODUCTION SCHEDULING 

2.3 PRINCIPLE OF SCHEDULING 

2.4.1 SCHEDULING TASK

2.4.2 INTERACTIVE SCHEDULING 

CHAPTER THREE

3.0 SYSTEM ANALYSIS DESIGN

3.1 OVERVIEW OF THE EXISTING BISCUIT PRODUCTION

3.2.1 SHORT CAKE PRODUCTION

3.2.2 CABIN BISCUIT PRODUCTION

3.3 PROBLEM WITH THE EXISTING SYSTEM

3.4 SYSTEM DESIGN

3.5 ANALYSIS OF THE PROPOSED SYSTEM

3.6 BENEFIT OF THE PROPOSED SYSTEM

3.7 INPUT DESIGN

3.8 ARRAY LAYOUT

CHAPTER  FOUR

4.0 SYSTEM IMPLEMENTATION, MAINTENANCE AND EVALUATION

4.1 SYSTEM IMPLEMENTATION

4.2 CHANGEOVER PROCEDURE

CHAPTER FIVE

5.0 SUMMARY, CONCLUSION AND RECOMMENDATION

5.1 SUMMARY

5.2 CONCLUSION

5.3 RECOMMENDATION

CHAPTER ONE

1.0 Introduction

Scheduling is a representation of the time necessary carry out a task and should take account of the technical requirement of the task, marketing forecast and available capacity. 

Scheduling is a programme of work to be done or a planned event in a faculty production scheduling.

 A PRODUCTION SCHEDULER: A product scheduler shows the technique through which set of production tasks in a factory can be assigned to machines or personal that will be responsible to a carryout such as tasks, using principle of assignment. There must be an equal number of tasks to the machine or personal available to carry out.

A product scheduling shows plan for the Manufacturing or a production of a particular products. This plan must be perfectly carried out to minimize the cost of production of the products in the factory. Thus, task time, number of proceeds and the number of available resources are input for considering using assignment technique.                  

ASSIGNMENT TECHNIQUES: This is used to allocate job to machine in computing. The cost of a production job. Therefore, the computerization of production scheduler, using assignment techniques would like to device a minimum cost assignment of a job to a production.

1.1 Historical Background Of The Case Study

Okin biscuit limited, Offa was incorporated in December 1998 by chief E.O Adesoye after his visit to Indian and tries of Mr. Kiswadala, Mr. P.E Keshavan and Mr. Vigay were given the task to monitor the project, as a result of this the structuring and construction of the factory started immediately and at the same time the shipment and installation of the machineries into the factory was between December   1978 and June 1980. Immediately after the completion of the factory structure and the machine installation Mr. Keshwadala was made the general manager company while Mr. P.K Jesharan was appointed the maintenance Engineer of the company, However, the first production of Biscuit started on 2nd of June 1980 with the coaster brand. This brand was still in market when another brand called short cake came out in 1984.

SHORT CAKE: This short cake product affected the sales of the coaster brands at the initial stage due to its sweetness but later in the years, there was equilibrium in their sales and it has made it possible to found in biscuit within outside Nigeria.

However, the company initially started with the following department are: Production Engineering, Accounts and administrative department, but with expansion of its production capacity, the marketing and security Department, was introduced to facilitate the prompt sales and marketing of their products and security of the products by monitoring the works for not stealing biscuit. The company in 1996 introduced another fine products called CABIN, while is still in market but nevertheless, the company has produced some biscuits, which has been out of production such as GEM biscuits.

1.2 Organizational Structure of the Case Study

Okin biscuit limited is structured and organized into various departments namely: production, accounts, engineering, marketing, security and administrative department in which each department is headed by a manager and each section is headed by sectional leader.

However, the General Manager overseas all activities in the company in which some responsibilities are assigned to the various head of department.

Time keepers operators

Chief executive

Board of director

General manager

Chief Acct

Chief Engr

Production manager

Administration manager

Marketing manager

Cash manager

Production supervisor

Admin officer

Chief security

Marketing Assistance

Senior Accountant

Ass chief Engr

Senior operators 

Machines operators

Security Guards operators

Security Guards operators

Floor workers

Accountant

ORGANIZATION CHART

PRODUCTION DEPARTMENT

The production manager heads production department. This department into five section viz: mixing, cutting oven, packing and store section.    

These section are headed by three supervisors who are rotated on the three working shift.

⦁ MIXING SECTION: This section is assigned the responsibility of mixing the various ingredients that are required for the baking of the biscuit.

⦁ CUTTING SECTION: This section is where the mixed biscuits ingredients are cut into shape before it will get into the baking oven.

⦁ OVEN SECTION: In this section the cut biscuit is baked with an aid of canvass belt, which will carry out the cut biscuit along the oven down to the parking section 

⦁ PACKING SECTION: This section is responsible for packing, selection and supplying biscuits to the machine that will help in sealing the biscuits into the cattophones and at the same time the total sealing of the carton is done here.   

⦁ STORE SECTION: This section is assigned with responsibility of keeping both the raw materials for the production and finished products.

The assumption made is that each stage has three different machines which can handle the intended work effectively but the vary capabilities. This research work centre on how these machines can be combined together in order to achieve our  aim of profit maximizing and cost minimization. This project work will dare not extorting its tentative beyond the specified of biscuits production.

1.3 Significance of the Study

This project work is mainly design for a schedule as: 

⦁ The representative which should be as  flexible as possible to enable the representation of schedules of different application with different resources and jobs.     

⦁ Support of scheduling tasks initiated either by a user or durative improvement.

⦁ Scheduling tasks an immediately feedback and to fasten the optimization algorithm

⦁ A schedule while should be an object that can be copied efficiently

ACCOUNTING DEPARTMENT: The accounting is headed by chief accountant who is responsible to the General manager for any financial matter. This department is responsible for taking care of the financial aspect of the company.It is also pivot to all other department  concerning money or any other financial report of the organization. They serve as  put where customer pay biscuit bought in the factory. The cashier manager who is responsible for coordinating the payment of staff salaries supervisors the salary aspect of the company. The department also works in collaboration with store section in payment for raw materials brought into the company.

ENGINEERING DEPARTMENT: The engineering department is the department that is responsible for the daily maintenance of the machineries that are used in the production of the biscuit

Engineering department is divided into two sections namely; electrical and mechanical engineering department. The chief engineers are appointed in which one is responsible for monitoring electrical cases of the machineries and the others.

1.4 Aims and Objectives of the Project

⦁ The purposes of this  research work is to decides the variable that goes into the decision making process in job scheduling of goods and services.              

⦁ The project work is also aimed at looking into problems associated with job scheduling and a suitable solution using computer design automation.

⦁ The project works will also investigate analyze current manual possess of production scheduling at Okin biscuit Nigeria limited and to introduce computer into this process, using assignment, introduce computer into the process, using assignment techniques .   

⦁ The overall objectives of this project work are to elinate  inappropriate projection scheduling process of the organization under study and there would be a proper minimization of production period and thus maximization of profit.

1.5 Statement of the Project

The problem of this study is to evaluate the manual means of scheduling the job, then develop a means to tackled these difficulties by using computer system.

1.5.1 Research Question

The research work is embarked with questions as:

⦁ Does this production scheduling described  as a problem of satisfying temporal constraints

⦁ Would the new proposal system serve as a guide to several objectives functions

⦁ What will be the relation that mapped on a satisfaction degree, which evaluates how good this constraints, is satisfied in the actual schedule?

⦁ Does the scheduling system optimally determine when and on  what machine steps are  to be possessed or handled?

1.6 Scope of the Project          

This project work covered three stages out of four stages involve in the production of biscuits, the three stages; mixing, cutting and baking stages.

The assumption made is that each stage has three different machines which can handle the intended work effectively but with vary capabilities. This research work centers on how these machines can be combined together in order to achieve our aim of profit maximizing and cost minimization this project work will dare not escorting its tentative beyond the specified of biscuit production.

.

DESIGN AND IMPLEMENTATION OF A COMPUTERISED PRODUCTION SCHEDULER SYSTEM



TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.NET
Researchwap.net is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.net guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.